溝槽管件連接工藝原理關(guān)鍵技術(shù)是什么What is the key technology of groove pipe connection technology?
通過對卡箍連接管道承壓能力的計算、卡箍構(gòu)造的研究和拉伸程度的分析、試驗,確定溝槽加工的寬度,保證卡箍有效安裝在溝槽內(nèi),消除因溝槽過寬導致卡箍連接處管道伸長量過大,提高管道運行的穩(wěn)定性。
采用“分段式、多層次”施工,即每層設(shè)兩只卡箍接頭,層層設(shè)固定支架的方式,解決了管道建筑中長距離立管自身的膨脹問題,解決了高層建筑在場地、運輸受限環(huán)境下的管道運輸、安裝及施工安全問題。
給水溝槽管件、襯塑溝槽管件、消防用溝槽管件,我公司常年供應(yīng),歡迎客戶們來電咨詢。
Through the calculation of the pressure capacity of the hoop connection pipe, the study of the hoop structure and the analysis and test of the stretching degree, the width of the groove is determined to ensure that the clamp is installed in the groove effectively, so as to eliminate the excessive pipe elongation caused by the width of the groove, and to improve the stability of the pipeline operation.
The construction of "segmented and multi level" construction, that is, two hoop joints in each layer and a fixed bracket, solves the problem of the expansion of the long distance riser in the pipeline building, and solves the problems of pipeline transportation, installation and construction safety in the high building under the restricted environment.
Water supply trenches, pipe fittings, lined plastic grooves and pipe fittings for firefighting, our company supplies all the year round. Customers are welcome to inquire.